Left Tank almost done
Now the coveted flop tube has been installed. Inverted flight- here we come!

I also went back and covered each rivet with sealant.

The flop tube is attached through the front of the tank. (the tank is rotated so the front is down) There are about 6 rivets underneath the sealant holding on the tank attach bracket that I made a few weeks back. There is a piece of electrical tape on the blue fitting keeping sealant off the threads.

I also sealed the outboard most rib tonight. Its now waiting for its 24 cure time, and then I'll rivet it. There are only a few more things left and this tank will be done!
I also went back and covered each rivet with sealant.
The flop tube is attached through the front of the tank. (the tank is rotated so the front is down) There are about 6 rivets underneath the sealant holding on the tank attach bracket that I made a few weeks back. There is a piece of electrical tape on the blue fitting keeping sealant off the threads.
I also sealed the outboard most rib tonight. Its now waiting for its 24 cure time, and then I'll rivet it. There are only a few more things left and this tank will be done!

0 Comments:
Post a Comment
<< Home